JH Renovation Weekly Progress Updates

Loading Map....

Date/Time
Date(s) - Thu 09/28/17
1:30 pm - 2:30 pm

Location
JH 274 - CHME Conference Room

Categories


jh-renovation-punch-list-2017-06-14-2.csv
room #DescriptionCompleted
289fume hood “yellow/green” alarm and the airflow monitor alarm issues
0security camera installation
184unistrut installation
184Seidel Brew Lab utility installation
193damaged lab benches/tables/chairs
193Eyewash station has two problems. The push-handle to turn on the water flow is broken. Also, there is no drain connection, so any water ends up on the floor.
193Have three sinks which need paper towel and soap dispensers and trash cans
268flooring installation in front of sink. Color selection complete.
274counter and sink need to be finished
289Fume Hoods have an oxidizer cabinet which is not vented per the contract drawings and the supplier has been asked to propose a solution.
292floor tiles should be made one color
outside SE corner of Jett HallDeep holes found where dirt sunk at corner of Building and at corner of where wall begins for ramp. CD showed Orasa 8/2/2017.
289Documentation of UL/FM Rating for Flammable Cabinets as part of Fume Hoods from Vendor and Architect confirmation.
282Splash protector on common drain sink between Autoclave and Glass Washer. When drains are running water splashed onto the floor and under the Autoclave